Discover Our Real Estate Tax Incentive Services
RPTI reviews purchase agreements and 1031 exchanges to protect the buyer’s tax position and capture available benefits at closing. Clear written allocations of value help satisfy Tax Court standards for binding arm’s-length agreements. We also identify the depreciation election (carryover vs. elect out) on 1031 exchanges, so the replacement property’s basis is depreciated in the most advantageous way.
Purchase-agreement language matters. Courts generally respect written allocations of purchase price among land, building, and personal property when the parties have adverse interests and the agreement is binding. RPTI reviews these provisions, so the allocation is clear, supportable, and less likely to be recharacterized later.
On 1031 exchanges, Treas. Reg. §1.168(i)-6 creates two pieces of basis in the replacement property: Exchanged (carryover) basis continues the remaining recovery period and method of the relinquished property. Excess basis is the additional investment, treated as newly placed in service. Taxpayers may elect out of the split (Treas. Reg. §1.168(i)-6(i)) and treat the entire basis as newly placed in service. The right choice depends on remaining lives, the mix of short-life components, and bonus-depreciation eligibility. RPTI identifies which election produces the better result and helps structure the acquisition so unintended depreciation consequences do not reduce the value of the deal.
The same review also flags opportunities for a cost segregation study on the excess basis (or the entire basis if the election out is made).
RPTI’s detailed component takeoffs let owners and CPAs correctly classify annual repairs, expense eligible costs, and retire replaced components under the IRS tangible property regulations. The original cost segregation study supplies the unit-of-property map; no additional study fees are required each year. This prevents stranded assets—original components that have been replaced but remain locked in the building’s basis.
Under Treas. Reg. §1.263(a)-3, a cost is capitalized only if it results in a betterment, restoration, or adaptation of a unit of property. For buildings the unit of property is the building structure plus each designated system (HVAC, plumbing, electrical, etc.). Costs that do not meet the betterment/restoration/adaptation test are generally deductible repairs.
When a component is replaced, the taxpayer may elect a partial disposition (Treas. Reg. §1.168(i)-8) and recover the remaining adjusted basis of the retired portion in the year of disposition. Without the election the old basis stays on the books (a “stranded asset”) while the new cost is capitalized.
The component-level schedules from the original RPTI study give the owner or CPA the numbers needed to identify which expenditures can be fully expensed, calculate the remaining basis of replaced items for a partial-disposition election, and avoid double-counting or leaving obsolete assets on the depreciation schedule. These analyses can be performed annually with no further fees to RPTI.
RPTI’s disposition analysis (Segregated Liquidation) allocates the sales price according to the fair market value of individual assets, as required by the IRS. This approach substantially lowers ordinary-income depreciation recapture compared with a simple pro-rata allocation based on original cost. The same documentation works for both cash sales and 1031 exchanges.
IRS rules require the amount realized on a sale or exchange to be allocated among the assets transferred according to their relative fair market values (see Pub. 544 and related regulations). A common shortcut—spreading the sales price in the same ratio as the original cost basis—overstates the amount assigned to shorter-lived §1245 property and therefore increases ordinary-income recapture.
RPTI’s component-level data supports a supportable fair-market-value allocation. The result is typically lower ordinary-income (§1245) recapture on personal-property components, more of the gain treated as unrecaptured §1250 gain (capped at 25%) or long-term capital gain, and cleaner basis calculations for any 1031 replacement property.
In a 1031 exchange the allocation still matters: it affects how much gain is recognized if boot is received and how the deferred gain is embedded in the replacement property’s basis. The analysis can be prepared at any time before closing and does not require a new full cost segregation study if the original RPTI documentation is available.
RPTI represents owners in negotiations with public authorities to improve project economics before and during construction. We help secure impact-fee credits or deferrals, tax rebates or abatements, municipal contributions, property-tax reductions, and support for bond financing, land acquisitions, or land trades. We also coordinate entitlement and permitting steps to reduce delays and carrying costs.
Public incentives commonly include impact-fee credits, waivers, or deferrals that lower upfront cash outlays; property-tax abatements, rebates, or payment-in-lieu-of-tax (PILOT) arrangements; tax-increment financing (TIF) or special-assessment structures; direct municipal contributions, discounted land, or land trades; and assistance with bond financing or other public funding vehicles.
RPTI works with the owner’s development team and counsel to document the economic benefit, negotiate the terms, and coordinate the approvals so the incentives are secured without creating unexpected tax or timing issues. (Note: after the Tax Cuts and Jobs Act, many governmental contributions are taxable under §118; the net after-tax value is evaluated accordingly.)
Entitlement and permitting coordination runs in parallel—identifying required studies, sequencing applications, and addressing agency comments—so delays that increase financing costs are minimized.
RPTI assists with the environmental and land-use steps required to move a project forward. We support environmental studies and reviews needed for approvals, coordinate land-use and zoning matters with municipal authorities and help reduce delays that affect project cost and timing.
Development often requires Phase I/II environmental site assessments, wetland or habitat reviews, traffic or utility studies, and related technical reports. RPTI helps identify the necessary studies, coordinate with qualified consultants, and package the results so they satisfy agency requirements.
On the land-use side we assist with zoning amendments, conditional-use permits, site-plan approvals, and related entitlements. Early identification of constraints and consistent communication with planning staff reduce the risk of late-stage redesigns or extended review periods.
These services are coordinated with the negotiated incentives work so that entitlement conditions and incentive agreements reinforce rather than conflict with each other. The goal is a clear path to permits and construction with fewer surprises in cost or schedule.